The team from Brookfield Lutheran just left on Saturday, their presence helped to move things forward dramaticially.
We are seeing the masonry walls continue to rise, as a local team of brick layers continues their work. The picture above shows a continous beam that is being installed at the ceiling level to maintain strength in the walls, and tie everything together. This is one of the keys to a well built and long lasting structure.
We are also nearing completion of the bathroom that has been added to our neighbor's house. This widow had outdoor "plumbing" for years, now she is going to have one of the best bathrooms in the village, including a sink, toilet, and shower, as well as a refillable water supply that she can use.
Things are happening so fast, we'll keep you up to date as much as possible!
0 comments:
Post a Comment